Dylan’s BI Study Notes

My notes about Business Intelligence, Data Warehousing, OLAP, and Master Data Management

Using Load Plan for managing your ETL task in BI Apps 11.1.1.7.1 (1)

Posted by Dylan Wan on May 14, 2013

One of the major change introduced in BI Apps 11.1.1.7.1 is the way how we manage the ETL task sequence and trim the unnecessary tasks.

This functionality was accomplished earlier using DAC.  The problem we frequently faced was that the DAC repository and the INFA repository are maintained as two separate repositories.  We have to sync up the name of tasks exactly in order to use DAC to manage the task execution of the Informatica workflow tasks.

Load Plan and Load Plan Generator was designed for addressing this requirement.

Here is a good article that describes the story.

Load Plan Generator – An Inside Look

About these ads

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
Follow

Get every new post delivered to your Inbox.

Join 38 other followers

%d bloggers like this: